The first task this week was finishing the model - which unfortunately had some unforeseen challenges. I realized on Sunday that while putting the components together, I had made a few errors in one of my laser cutter patterns - specifically, there were some missing holes in four parts and four less small parts than I needed. On Monday, we fixed the four parts with the missing holes: my dad and I simply used some of the other parts with the correct hole position as reference, and drilled the holes in the manner shown in the image below, and the results worked perfectly. We also made many wooden spacers for the upper part of the guideways, which needed to clear the support beam while looking relatively flush with the upper parts of the side brackets.
Likewise, the flanges that a teammate passed to me were unfortunately not the right type - having a threading where the PVC was supposed to go, and the holes for screws being far too big. For the first part, the solution was to purchase some adapters (two for me and one for my groupmate), which had the added advantage of allowing fine tuning for the pvc pipes height. For the second problem we simply drilled small holes into the thick areas off the flange, and by using a guideway as a spacing reference, attached them to a large wood board.
No comments:
Post a Comment